![]() |
||||||
| PROJECTS PEOPLE CONTACT | ||||||
KITCHEN CUBE. . Construction NEXT IMAGE |
![]() |
The original floor was of suspended timber construction which meant that there was a large void beneath the house. This void was poorly ventilated and contributed to stale odours within the house. The renovation involved the construction of a a new sub floor with 140mm insulation and a radon barrier to prevent the build up of harmful gasses within the house. |
||||